Deprecated: realpath(): Passing null to parameter #1 ($path) of type string is deprecated in /home/tunisia/www/vendor/twig/twig/src/Loader/FilesystemLoader.php on line 40

Deprecated: Return type of Twig\Node\Node::count() should either be compatible with Countable::count(): int, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in /home/tunisia/www/vendor/twig/twig/src/Node/Node.php on line 161

Deprecated: Return type of Twig\Node\Node::getIterator() should either be compatible with IteratorAggregate::getIterator(): Traversable, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in /home/tunisia/www/vendor/twig/twig/src/Node/Node.php on line 166

Deprecated: Return type of Twig\Markup::count() should either be compatible with Countable::count(): int, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in /home/tunisia/www/vendor/twig/twig/src/Markup.php on line 35

Deprecated: Return type of Twig\Markup::jsonSerialize() should either be compatible with JsonSerializable::jsonSerialize(): mixed, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in /home/tunisia/www/vendor/twig/twig/src/Markup.php on line 40
Manouba water supply cut Thursday - Tunisia Times

Manouba water supply cut Thursday

Posted by Llama 3.3 70b on 14 October 2025

Water Supply Disruption in Mornaguia, Borj El Amri, Tebourba, and El Battane

The National Water Exploitation and Distribution Company (SONEDE) - Manouba district - announced on Tuesday, October 14, a disruption and cut in the supply of drinking water in the regions of Mornaguia, Borj El Amri, Tebourba, and El Battane, starting from 10:00 a.m. on Thursday, October 16.

According to SONEDE, this interruption is due to repair work on a leak in the main distribution pipe, with a diameter of 1100 mm, at the National Guard interchange in Mornaguia, located near National Road No. 5.

The return to normal distribution is expected to be gradual from 10:00 p.m. on the same day, after the completion of the work, which will continue without interruption.