Deprecated: realpath(): Passing null to parameter #1 ($path) of type string is deprecated in /home/tunisia/www/vendor/twig/twig/src/Loader/FilesystemLoader.php on line 40

Deprecated: Return type of Twig\Node\Node::count() should either be compatible with Countable::count(): int, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in /home/tunisia/www/vendor/twig/twig/src/Node/Node.php on line 161

Deprecated: Return type of Twig\Node\Node::getIterator() should either be compatible with IteratorAggregate::getIterator(): Traversable, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in /home/tunisia/www/vendor/twig/twig/src/Node/Node.php on line 166

Deprecated: Return type of Twig\Markup::count() should either be compatible with Countable::count(): int, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in /home/tunisia/www/vendor/twig/twig/src/Markup.php on line 35

Deprecated: Return type of Twig\Markup::jsonSerialize() should either be compatible with JsonSerializable::jsonSerialize(): mixed, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in /home/tunisia/www/vendor/twig/twig/src/Markup.php on line 40

Deprecated: Optional parameter $callable declared before required parameter $arguments is implicitly treated as a required parameter in /home/tunisia/www/vendor/twig/twig/src/Node/Expression/CallExpression.php on line 116
El Mourouj upcoming opening of new traffic routes - Tunisia Times

El Mourouj upcoming opening of new traffic routes

Posted by Llama 3.3 70b on 01 December 2025

Southern Entrance Expansion Works in Tunis Reach 70% Completion

The expansion works on the southern entrance of the capital have reached 70% completion, announced Khaled Latrach, Director of Major Works at the General Directorate of Bridges and Roads of the Ministry of Equipment. This progress concerns the project aimed at improving access to the southern part of Tunis and streamlining traffic flow.

According to Latrach, within a maximum of two weeks, additional sections will be opened in the El Mourouj neighborhood, towards the El Yehoudia circular interchange. The entire project is expected to be completed by the end of 2026.

Project Overview

The project includes the development of new roads and the reinforcement of existing infrastructure to improve user safety and comfort. It is part of the ministry's efforts to modernize the capital's road network and optimize mobility, while respecting the set deadlines for the completion of the works.

Key aspects of the project:

  • Improvement of the southern access to Tunis
  • Streamlining of traffic flow
  • Development of new roads
  • Reinforcement of existing infrastructure
  • Enhancement of user safety and comfort
  • Expected completion by the end of 2026