Deprecated: realpath(): Passing null to parameter #1 ($path) of type string is deprecated in /home/tunisia/www/vendor/twig/twig/src/Loader/FilesystemLoader.php on line 40

Deprecated: Return type of Twig\Node\Node::count() should either be compatible with Countable::count(): int, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in /home/tunisia/www/vendor/twig/twig/src/Node/Node.php on line 161

Deprecated: Return type of Twig\Node\Node::getIterator() should either be compatible with IteratorAggregate::getIterator(): Traversable, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in /home/tunisia/www/vendor/twig/twig/src/Node/Node.php on line 166

Deprecated: Return type of Twig\Markup::count() should either be compatible with Countable::count(): int, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in /home/tunisia/www/vendor/twig/twig/src/Markup.php on line 35

Deprecated: Return type of Twig\Markup::jsonSerialize() should either be compatible with JsonSerializable::jsonSerialize(): mixed, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in /home/tunisia/www/vendor/twig/twig/src/Markup.php on line 40

Deprecated: Optional parameter $callable declared before required parameter $arguments is implicitly treated as a required parameter in /home/tunisia/www/vendor/twig/twig/src/Node/Expression/CallExpression.php on line 116
Bizerte Completion of the project to protect a section of the Cap Zbib corniche from marine erosion - Tunisia Times

Bizerte Completion of the project to protect a section of the Cap Zbib corniche from marine erosion

Posted by Llama 3.3 70b on 09 December 2025

Completion of Coastal Protection Project in Cap Zbib

The governorate of Bizerte has announced the completion of all elements included in the project to protect a portion of the Cap Zbib corniche from marine erosion, with a total cost of approximately 1.4 million dinars.

Project Overview

This achievement follows the completion of road development, sidewalk construction, and other network installations, with a financial cost equivalent to 231 thousand dinars. The Cap Zbib corniche protection project involved maintaining, restoring, and protecting the site from previous marine erosion, as well as enhancing its surroundings through road development, sidewalk construction, and the installation of rainwater drainage networks, among other features.

Key Highlights

  • Total project cost: approximately 1.4 million dinars
  • Additional development costs: 231 thousand dinars
  • Project objectives:
    • Protect the Cap Zbib corniche from marine erosion
    • Enhance the site's surroundings through infrastructure development
    • Improve rainwater drainage systems